Tillo Project
Initial exploration has delineated a 2.5 km × 1.0 km zone of copper anomalism, supported by geological mapping and a porphyry-style mineral system. Rock sampling has returned copper values exceeding 1%, with a maximum recorded grade of 5.98% copper, alongside elevated molybdenum values.
Next Steps
Current work is focused on advancing Tillo toward drill target definition through systematic exploration, including detailed geological mapping, additional rock and soil sampling, and hyperspectral studies to characterize alteration and vector toward mineralized centres.
Technical